Choose to test the road surface broken
 
          Test pit inspection
 
          Confirm the crushing construction process
 
          Broken construction
 
          Z-type roller compaction
 
          Sprinkle emulsified bitumen permeable layer oil
 
          Make a water-stable layer (when needed)
 
          Asphalt road construction
 
          
Collection of pavement related information

The crusher breaks it again

Vibration compaction of Z-type roller

Spreading floating asphalt permeable layer

Pave the asphalt concrete surface in 8-12 hours

Pavement after reconstruction